History

PGEI Group puts nearly half of the centry experience to work for the manufacturing and production of Fix Equipment, Tanks and Chemical Packages stablished in 1974.

History

PGEI Group puts nearly half of the centry experience to work for the manufacturing and production of Fix Equipment, Tanks and Chemical Packages stablished in 1974. This company is specialized exclusively in the design development and fabrication of equipment for Oil & Gas Industries. Its factory is based in Ahwaz city, the center of Oil and Gas fields of Iran, is well placed to other areas in the Persian Gulf and the Middle East.

2006

Upgrading Ahwaz Factory

Upgrading Ahwaz Factory

In this Year, 8000 square meters were added to the workshop space of the PGEI Group Ahwaz Factory and also The Cold Rolling capability was increased from 100mm to 150mm. As a result, the company's working capacity increased to 15000 tons per year.

2010

Established BANADR-ABBAS Factory

Established BANADR-ABBAS Factory

Recognizing the need for heavy equipment in the country's southern energy industries, the PGEI Group decided to establish a factory near the sea. For this purpose, Bandar Abbas was selected, that The factory was equipped with a capacity of 4000 tons per year on an area of 18 hectares and 8000 square meters of Covered area for the production of heavy metal equipment. From 2010 until now, more than 6000 tons of heavy Steel equipment has been fabricated, tested and delivered

2014

The Department of Green Energy was established

The Department of Green Energy

The Department of Green Energy was established

2016

Last Delivery of 98 equipment to Persian Gulf Star Oil Refinery

Delivery last equipment to Persian Gulf Star Oil Refinery

In 2016 PGEI Group was delivered latest equipment of 11000 MT contract contain 98 Item (26 Item Column, 24 Item High Pressure Vessels and 48 Item Pressure vessel) to Persian Gulf Star Oil Refinery, the Value of the Contract was more than 70M$.

2017

Shiraz ISOMAX Refinery

Delivery ISOMAX to shiraz Refinery

For the first time in Iran, PGEI Group Design and Manufacture ISO-MAX under license of Lorgi for Shiraz Refinery. Body Material of this ISOMAX is 2.25Cr-1Mo + SA-347 Cladding with 380bar Hydro-test pressure and 194+7mm thickness.

2018

Kangan Project

Ractorsaz Kangan Project

In 2018 PGEI Group had delivered to 5 sets VESSELS AND DRUMS as below (Wet Air Receiver, Compressed Instrument Air Receiver, HHP / HP / LP Fuel Gas K.O Drum) 200 MT contract to KANGAN utility & offsite project located at KANGAN petro refining complex KANGAN / ASSALUYEH – BUSHEHR province IRAN.

2019

Fast Track Production

Fast Track Production

In 2019, PGEI Group completed two Fast Track Projects According to Client Request

 
Item Project Name Weight Type Production Time
I NGL Kharg 133 Ton Depropanizer Column 55 days
II Persian Gulf Star Refinery 248 Ton 6-Items Dryer 76 days